Autoclaved concrete block making machine,block machine,construction machine

Location:
Zhengzhou, China ( Mainland)
Status:
New
Sample Availibility:
yes
Payment Terms:
Cash, Bank Transfer, Letter of Credit, T/T, L/C

Product Description

manufacturer constructione quipment block making machine production line high demand products concrete machine concrete block machine concrete block making machine concrete block aac block new technology cement block making machine compressed earth blocks machines hollow block making machine block making machine price concrete cutting machine lightweight concrete price concrete block machine cement block machine concrete brick making machine hollow blocks lightweight concrete foam concrete concrete foaming agent block factory foam concrete block machine aac production line concrete production manufacturing plants autoclave industrial aac plant machinery and equipment concrete leveling machine decorative concrete block high profit products concrete brick machine chinese manufacturing clc block machine aerated concrete aac block production line machines manufacturing companies in china line

DYKF4.2 Air-tilting Autoclaved Aerated Concrete plant hot selling in india

1. Applied Germany Ytong & Hess Group technology and combined with China innovation;

2. Cutting machine adopt frame shaking and cutting, which is most reliable designing;

3. Turning table realizing six-sides peeling successfully for aac block cake;

4. Fully automatic & Semi automatic designing;

5. Siemens Brand Motor & PLC Control;

6. Japan YUKEN hydraulic system, Germany Schneider switch;

7. China AAC Association Group best quality and scientific designing;

8. Equipments lifetime maintaining service.

What is the AAC block?

Autoclaved Aerated Concrete block is used as light and porous buidling materials,which is light and retains heat,Impermeable,Resist fire,Insulate sound,Precise size,High strength,Convenient construction,Economic,Environmental protection,can be made into many kinds of bricks,for example :600×250×250,600×200×200,600×150×200,600×100×100,used in industry building and common building.More and more popular in the world,and it will replace the clay brick completely in the future.

The Advantage of AAC block:

What is the raw material and proportion?

Common concrete density is usually 1600-2400kg/m3,but Areated concrete are 500kg/m3,600kg/m3,700kg/m3.It has not the big grain,main use silicon material (for example:coal ash,sand,stone dust and others ),through making the material small for example sand,they can be used directly if has enough degree of small (for example coal ash.Mixing calcium material lime cement water to a special slop,then add the aluminum dust and the additive.Make the aluminum dust and the special slop have a Chemical reflect.then produce Hydrogen to make the concrete slop to expanding or swell,foam.Next,put them into the curing room to concreting cutting steaming curing,last,there will bacome the light brick,the porous rate is 70-80%

NO.ItemsProportion

Using Composition

1Slicon Materials(Coal Ash or Sand)60%~70%

450-500kg

2

Lime

20%~24%90kg
3

Cement

10%~20%

70kg

4

Gypsum

3%

5kg

5

Aluminum Paste

0.07%~0.08%

0.5kg

6

Water

300L

7

Electricity

9 degree
8

Coal

30kg

The 3D picture of AAC production line:

The main technical parameter of AAC production line:

1 The aac block is 600KG/CBM

2 Annual capacity:50,000-400,000cmb.

3 Basic formula ratio: aluminum powder 450g/cbm,admixture 400g/cbm

Flyash: gypsum:cement:lime=73%:3%:3%:18-22%.

Sand:gypsum:cement:lime=63%:3%:10%:18-22%

4 Water and materials ratio: 0.6-0.7

5 A mould product: 4.2x1.2x0.6=3.024cbm

6 Casting mixing cycle:4.5minutes

7 Casting slurry temperature:42-48°C

8 Body's maintenance:after 1.0-1.5hours,50°C,the body's strength will be 0.15-0.18Mpa

9 Autoclave curing cycle: Go to and get out of the autoclave:0.5hour,Exhaust:0.5hours,boost pressure1.5hours,Constant voltage:4hours,1.3MPA,reduce pressure:1.5hours,Total:8hours.

The process of AAC production line:

Materials → Calculate→ Mixing with water →Putting Mould→ Casting → Pre-curing→De-moulding → Cutting → Separating → Autoclaving→ Unloading → Packing

1.Raw material preparation and storage
(equipment: jaw crusher,Bucket elevator ,silo,Electronic Vibrating Feeder,Ball Mill ,mould and so on ) Fly ash (or sand, stone) by electromagnetic vibrating feeder and belt into the ball mill, the fly ash( after grinding fine sand, stone) with fly ash pump were sent to the pulp cans of storage. Lime by electromagnetic vibrating feeder and belt into the jaw crusher are broken, broken by dou type of lime hoist into lime storage and then by screw conveyor into fine after grinding ball mill, material is screw conveyor, dou type hoist into powder batching.
Chemicals in a certain proportion after artificial measurement, made certain density solutions, into in the tank is stored. Aluminium by aluminum library shipped to the production workshop, electric hoist ascent to ingredients floor on the second floor combine ingredients in blender filled quantitative water, stir into aluminum powder suspending liquid.

2.Ingredients, mixing, pouring
(equipment: screw conveyer,silo,Aluminum mixer,Pouring machine,control system and so on) Fly ash slurry or sand slurry will be measured by slurry electronic measurement in ingredients center .Lime, cement are sent by spiral feeder to measure.Then all the raw materials will be sent to pouring mixer machine by feeding equipment for high-speed mixing,All measurement through PLC automatic centralized control,to assure accuracy and continuity of measurement.After a few minutes,then the arm of casting machine starts pouring material to the mold box.

3.Static stop maintenance
(equipment: Static stop maintenance room)
After pouring,mould should be sent to static stop maintenance room for preliminary condensation, the temperature need 50 to 70°C for 1.5-2 hours.(according to the geographical advantages, can discharge the process).

4.Cutting section
(equipment: aac cutting machine,air compressor,Recycling mixer)
AAC blocks Cutting :Turns over the hoisting mechanisms airborne to turn over together the mold belt body on 90 degree laying aside cutting car, the drawing of patterns keeps the body together with the side bar cuts on the car, cutting car to make the power by the electrical machinery to walk, completes longitudinal cutting, the milling, level cutting through the slitting installment; Cutting car continues to walk after the infeed set-up central location stop, the infeed set-up starts, transverse cutting vertical undercuts from the top downward completes the across cutting; Cutting car to walk again to the grouping hoisting mechanisms place (side bar hangs continually) by the grouping hoisting mechanisms the body to steams raises on the car, cutting car to return to the initial position to carry on the next cutting circulation.
Stripping the given photo-cell and lateral plate stay together with cars, Cutting edge horn produce given photo-cell and waste, the screw conveyor to cutting waste pulp by stirring loops made waste water machine, the slurry, stay ingredients when used.

The parameters of DY air-tilting autoclaved cutting machine are as follows:

Item

UNITDYKF4.2MDYKF4.8MDYKF6.0M

Production capacity

10000m³/year

100000-150000m³

200000-250000m³

300000-350000m³

Size m

4.2x1.2x0.6

4.8x1.2x0.6

6.0x1.2x0.6

Precision in cutting

mm

±3 ±1 ±1

±3 ±1 ±1

±3 ±1 ±1

Period in cutting

Min/mold

≤5

≤6

≤6

5.Coding and autoclave
(equipment: steaming larry,windlass,autoclaves,boiler and so on)
Finished grouping steaming larry will be sent to autoclaves by the slowly windlass,after 8-10hours blocks in autoclaves ,the finished blocks will be take out with the windlass behind the autoclave. A semi-finished crane hoist will send the blocks with side panel to conveying groove,then the the blocks would be sent to wooden pallets in the packing line by a finished crance hoist. The worker or automatic packing machine will pack the blocks ,the they are in finished goods yard. The empty side panel return and go on its cycle after cleaning.

6.Finished autoclaved concrete block:

Our factory:

The scene of clients using our equipments :

Our international trade:

Our transport:

The ISO,SGS,CIC Quality System Certification,and patent certification:

Welcome to visit our factory in Zhengzhou city,Kungfu’s hometown!



This member's information has NOT been authenticated or verified by importexportleads.net or any third party. Only Gold Members have completed an authentication and verification procedure conducted by third-party credit agencies.

For more information on importexportleads Gold Membership, Click here

Contact Information

Company:
 Zhengzhou DEYI Heavy Industry Machinery Manufacturing Co., Ltd.
Phone Number:
  0086-371-86599176
Fax Number:
 0086-371-86599172