CO2 7000~8000BPH 500ml carbonated beverage 3 in 1 filling machine

Location:
Zhangjiagang, China ( Mainland)
Status:
New
Sample Availibility:
yes
Payment Terms:
Cash, Bank Transfer, Letter of Credit, T/T, L/C
Categories:

Product Description

Brief work process:
Bottles are transmitted to the “Washing machine” of the Triad Isobarometric Filler by the “Bottle-feeding thumb wheel” via the “air conveyer”. The “Wash gripping dial” of “Washing machine” grips bottleneck and turn 180°along a guide rail that makes bottleneck adown. The special nozzles spray wash water to clean interior of bottles in the given area. After cleaning and drying, the “Wash gripping dial” turns bottles 180°again along the guide rail that makes bottleneck up. These cleaned bottles are put out from the “Washing machine” and transmitted to the “Filling machine” via the “Bottle-turning star wheel”. These bottles entered the “Filling machine” are folded by bell jars and elevated up to touch with filling valve by the lifter cylinder. Before entering filling machine, there is a button for inspecting bottles on the steel thumb wheel. It sends the bottle signal to control the opening valve mechanism, then the filling valve would be opened. The filling shall be started while air injection is reached to state of equipressure. The filling could be stopped automatically when the liquids level reach to the height of air return pipe. The filling valve is closed recur to valve-closing mechanism after filling. Then air is discharged and the complete filling process is finished. Bottles full filled come down to be off filling valve under the function of cam and be put into the “screw capper” via transitional thumb wheels. The bladed stopper on the “screw capper” locks the bottleneck to keep bottles erectly and avoid rotating. The “screw cap head” keeps revolution and rotation on the “screw capper” and carries out these movements of cap picking, cap covering, screw capping and cap unhitch etc. after that whole capping process is finished. The “cap aligner” is situated above the “screw capper”, it is connected with the cap pan of “screw capper” via the cap sliding rail. The finished bottles are transmitted to the bottle output conveyor chain via the bottle output thumb wheels. And which are transmitted out from the Triad Isobarometric filler by conveyor chain and put in the next process.

Main configuration:
1) Material of filling valve and hydraulic is 304.
2) Material of rinse and rotary plate, machine table is stainless steel 304.
3) Main motor:ABB
4) Sliding bearing:Igus, Germany.
5) Transducer: MITSUBISH
6) Touch screen:DIGITAL
7) PLC:OMRON
8) Pneumatic components:SMC
9) Seals:National brand or B+K
10) Photocell switch and proximity switch:TURCK (Germany)



This member's information has NOT been authenticated or verified by importexportleads.net or any third party. Only Gold Members have completed an authentication and verification procedure conducted by third-party credit agencies.

For more information on importexportleads Gold Membership, Click here

Contact Information

Company:
 Jiangsu Amstar Beverage Machinery Co., Ltd.
Phone Number:
  0086-512-35005007
Fax Number:
 0086-512-58533068