Silent explosive demolition agent

Location:
Wuhan, China ( Mainland)
Status:
New
Sample Availibility:
yes
Payment Terms:
Cash, Bank Transfer, Letter of Credit, T/T, L/C
Categories:

Product Description

uTechnical Advantages

Easy to use:Take a certain amount of this product according to the service conditions, put into quantitative water and make mixture.Excellent flow property :High-performance surface active component makes the flow property and grouting more better.Speed Brokage:This product has good expansion effect and large expansion pressure, and the expansion effect appears in 5~24 hours.High security coefficient:The product formulation can be designed according to customers’ requirements, so sufficient operating time is left to avoid the operating risks.Stable product performance:Guarantee the product’s stability by selecting raw material with stable properties and doing precise product quality test.

uTechnical Characteristics

Setting Time:Initial setting≥10min,final setting≤150min.Expansion pressures in every age for different types.

Type

Suitable Temperature(°C)

Expansion Pressure(MPa)

8h

24h

48h

SCASTAR -Ⅰ

25~40

≥35.0

≥60.0

SCASTAR -Ⅱ

10~30

≥30.0

≥55.0

SCASTAR -Ⅲ

-5~15

≥20.0

≥30.0

≥40.0

uExecutive Standard

Executive standard:JC506-2008.

uPackage and Storage

The product is packed by special plastic bag inside while remarked paper carton outside, with each bag 5 Kg and each carton containing 4 bags. Customers’ good and reasonable Package requirements are also available.

The product should be sealed and stored in a dry place. Have been opened or unused product should be well sealed timely to prevent moisture and losing effectiveness. If product has broken package or moisture, should not continue to use.

uHow to Use:

uHow to Drill:

Refer to following table about the situations of different broken objects from construction experiences.

Types of objects need crush

Parameter

Usage Amount (Kg/m3)

Aperture (mm)

Pitch-row (cm)

Array Pitch (cm)

Bore Depth

Light Rock

30-45

30-50

30-50

H

8-10

Medium-hard Rock

30-45

25-40

20-35

1.05H

10-15

Hard Granite

35-45

20-40

20-30

1.05H

18-20

Rock Cutting

30-40

20-35

50-80

H

5-15

Unreinforced Concrete and Boulder Stones

35-50

20-30

25-35

0.9H

8-15

Reinforced Concrete

30-45

15-25

15-25

H

15-25

Remarks: H represents a broken object height.

Hole designs with different crushing requirements, as reference only.

uHow to mix:

Mix ratio 1:(0.28-0.3)(which means :5 kilograms of SCASTAR need 1.4~1.5 kilograms water). Blend it well at once by mixing tools or hands (Wear rubber gloves). The continuous stirring time should be 1~2 minutes.

uHow to Fill:

Make sure holes is clean, no water, slag and other sundry goods left inside. All holes such as slant holes and horizontal holes need plugging to avoid slurry flowing out except vertical opening holes. For high temperature, the whole mix and filling process should be quick and continuous and the filling should be finished in ten minutes, or else the slurry won’t be poured into due to fluidity loss. For mass objects’ crack, the operators should coordinate and adopt “team work”. During each loop operation, one group cannot deal with too many holes. To ensure perfect crack, pay attention to synchronization so that expansion pressure in all holes appears almost at the same time.

uHow to maintain: Maintenance:In Summer and Autumn, the construction needs no maintenance and it usually takes only 5~24 hours to crack. In Spring and Winter, should take warm water(about 40°C) to mix and take necessary heat maintenance measures, the crack time is usually in 20~30 hours. The lower the temperature is, the longer cracking time it takes.



This member's information has NOT been authenticated or verified by importexportleads.net or any third party. Only Gold Members have completed an authentication and verification procedure conducted by third-party credit agencies.

For more information on importexportleads Gold Membership, Click here

Contact Information

Company:
 Wuhan Ujoin Building Material Technology Co., Ltd.
Phone Number:
  86-027-86868668
Fax Number:
 86-027-86868338